The Stone Slinger

 
 

Access is limited due to the steep road to the foundation hole so the stone flinger seemed like a clever option. Just fling the crushed stone into place from the top of the access road. After slinging the crushed stone, it only took a little leveling work with a shovel and some rakes to have the floor ready for foam and the radiant pipes.

If you can’t reach, sling!